Anaerobic treatment plant
Bitterfeld-Wolfen

Special features

The plant operates as split flow treatment plant. It treats industrial waste water from chemical industry with high organic load and high salt concentration. Installation takes place in 2 phases, 1st phase is 50 %. All data refer to 100 %.

Technical data

  • Electrical power: ca. 1.2 MW
  • Thermal power: ca. 1.6 MW
  • Input COD: 40,000 kg/d

Process details

  • Equalization tank and hydrolysis tank
  • 4 Aquatyx reactors of R2S-type
  • Biological desulfurization
  • up to 6 CHP-modules, each 280 kWel
  • effluent to final aerobic treatment in the existing WWTP

Scope of supply

  • Basic engineering/detail engineering
  • Erection/construction/installation
  • PIO/training

Anaerobanlage GKW Bitterfeld
(PDF, German)
1.1 MB

Anaerob Plant Bitterfeld
(PDF, English)
1.1 MB
Client
GKW Bitterfeld-Wolfen
Start of works
01/2010
Completion
07/2011
Commissioning
01/2011