Selected Projects
- › WWTP Gaza
- › Waterworks Lingen
- › MBR Municipal Wastewater
- › MBR Brewery Wastewater Caribbean
- › Drinking Water Chabarovsk
- › WWTP Bettembourg
- › WWTP Immenstaad
- › Rothaus Brewery
- › Biogas Plant Lustadt
- › WWTP Eisenhüttenstadt
- › Anaerobic Treatment Plant Bitterfeld
You can find a detailed overview about our projects in the downloads section.
Biogas plant Lustadt
Process steps
- Silo system
- Intake hopper with push floor discharge
- Glass-enamelled fermenter
- Gas purification (desulphurisation)
- 2 combined heat and power plants (CHP), emergency gas / flare
- Storage tank digestate with gas holder roof
- Digestate preparation (separation)
- Exhaust air treatment (biofilter)
Scope of services
- Detailed engineering
- Turn-key construction
- Mechanical engineering, instrumentation technology and control system
- Installation/commissioning of mechanical and electrical engineering
- Training of plant staff
Process management takes place according to the flow principle and includes substrate preparation, fermentation, gas storage and gas utilization by 2 CHPs. Year-round heat consumption is guaranteed by a nearby nursery. At a present five million kWh of heat for the cultivation of seedlings and vegetables, potential savings of more than 30% is guaranteed by using high quality and redundant biogas plant components.
- Client
- Bioenergie Südpfalz GmbH, Germany
- Start of construction
- 04/2008
- Commissioning
- 12/2008
- Electrical capacity
- 2,1 MW
- Thermal capacity
- 2,1 MW
- Fermenter 3 units
- je 3,000 m³
- Digestate storage tank
- 5,000 m³

Lustadt