Drinking Water Treatment Plant Chabarovsk

Technical Data

  • Aquifer consisting of
    5 sections
  • Output capacity drinking water: max. 106,000 m³/day

Each section:

  • Subterranean treatment with
    12 booster wells
  • 4 infiltration wells
  • Oxygen enrichment plant with
    4 flatbed aeration
  • Pump station
  • Electrical control in wells and enrichment plant
  • Fully automated control with SCADA and PLS
  • Piping in stainless steel 1.4571

Scope of supply

  • Detailed engineering
  • Logistics / customs
  • Mechanical and electrical equipment
  • Installation
  • Commissioning
  • Personnel training

Special features

  • Removal of iron and manganese in high concentrations and with subterranean technology
Client
KHABAROVSKAYA REMONTNO- STROITELNAYA KOMPANIYA („KhRSK“)
Commissioning
11/2011
Completion
expected 2014