Selected Projects
- › WWTP Gaza
- › Waterworks Lingen
- › MBR Municipal Wastewater
- › MBR Brewery Wastewater Caribbean
- › Drinking Water Chabarovsk
- › WWTP Bettembourg
- › WWTP Tuzla
- › Rothaus Brewery
- › Biogas Plant Lustadt
- › WWTP Eisenhüttenstadt
- › Anaerobic Treatment Plant Bitterfeld
You can find a detailed overview about our projects in the downloads section.
Drinking Water Treatment Plant Chabarovsk
Technical Data
- Aquifer consisting of
5 sections - Output capacity drinking water: max. 106,000 m³/day
Each section:
- Subterranean treatment with
12 booster wells - 4 infiltration wells
- Oxygen enrichment plant with
4 flatbed aeration - Pump station
- Electrical control in wells and enrichment plant
- Fully automated control with SCADA and PLS
- Piping in stainless steel 1.4571
Scope of supply
- Detailed engineering
- Logistics / customs
- Mechanical and electrical equipment
- Installation
- Commissioning
- Personnel training
Special features
- Removal of iron and manganese in high concentrations and with subterranean technology
- Client
- KHABAROVSKAYA REMONTNO- STROITELNAYA KOMPANIYA („KhRSK“)
- Commissioning
- 11/2011
- Completion
- expected 2014

