Selected Projects
- › WWTP Gaza
- › Waterworks Lingen
- › MBR Municipal Wastewater
- › MBR Brewery Wastewater Caribbean
- › Drinking Water Chabarovsk
- › WWTP Bettembourg
- › WWTP Immenstaad
- › Rothaus Brewery
- › Biogas Plant Lustadt
- › WWTP Eisenhüttenstadt
- › Anaerobic Treatment Plant Bitterfeld
You can find a detailed overview about our projects in the downloads section.
Cayman Islands Brewery Ltd.
Special features
- Very compact, space-saving design
- Completely prefabricated (container)
- Fast commissioning
- Achievement of cleaning capacity at short notice
- Wastewater disinfection by retention of germs and viruses
- Water output in bathwater quality
- Use as service and irrigation water
- Elimination of biologically difficult degradable substances and micropollutants
Scope of services
- Planning / detailed engineering
- Manufacturing / assembly container plant
- Electromechanical equipment
- Onsite construction
- Commissioning / training
- Remote monitoring and control
- Supply of spare and wear parts
- Client
- Cayman Islands Brewery Ltd.
- Start of construction
- 04/2006
- Completion
- 09/2006
- Commissioning
- 11/2006
- Capacity
- 830 EWG (CSB)
- Flow-through
- max. 96 m³/d
- Volume
- 30 m³
- Membrane surface area
- 200 m²
- Process steps
-
- Aerated wastewater reservoir
- Inlet pumping station

