Bettembourg sewage plant
Turn-key extension as general contractor
Technical data
- Flow-through 1,000 l/s
- Inlet pumping station / 2 screens
- 2 sand traps / 2 primary sedimentation tanks
- Intermediate pumping station
- 4 aeration tanks / Blower station
- 4 secondary sedimentation tanks
- Pre and post-thickener
- 2 digesters 1,450 m³
- 2 sludge thickening / sludge silo
- 2 sludge dewatering
- Gas holder 1,000 m³ / torch / flare
- 2 combined heat and power plants (CHP) / 1 emergency diesel
- Sand washing and sewer material intake
Scope of services
- Complete installation
- Controls and programming
Process steps
- Mechanical steps
- Biological steps
- Anaerobic sludge digestion
Special feature
- Modification during operation
- Client
- Syndicat Intercommunal, Step Bettembourg
- 1. construction stage
- 09/2007
- 2. construction stage
- 09/2008