Bettembourg sewage plant

Turn-key extension as general contractor

Technical data

  • Flow-through 1,000 l/s
  • Inlet pumping station / 2 screens
  • 2 sand traps / 2 primary sedimentation tanks
  • Intermediate pumping station
  • 4 aeration tanks / Blower station
  • 4 secondary sedimentation tanks
  • Pre and post-thickener
  • 2 digesters 1,450 m³
  • 2 sludge thickening / sludge silo
  • 2 sludge dewatering
  • Gas holder 1,000 m³ / torch / flare
  • 2 combined heat and power plants (CHP) / 1 emergency diesel
  • Sand washing and sewer material intake

Scope of services

  • Complete installation
  • Controls and programming

Process steps

  • Mechanical steps
  • Biological steps
  • Anaerobic sludge digestion

Special feature

  • Modification during operation

Kläranlage Bettembourg
(PDF, German)
524 kB

WWTP Bettembourg
(PDF, English)
454 kB
Client
Syndicat Intercommunal, Step Bettembourg
1. construction stage
09/2007
2. construction stage
09/2008