Water Treatment Dubai

Work Scope

  • Basic and detail engineering
  • Supply of complete Electro-Mechanical Equipment
  • On-Site Work Supervision
  • Commissioning / Training
  • SCADA
  • Supply of Spare Parts

Process Steps

  • Process Water Treatment (10 m³/h)
  • Cooling water circulation 100 m³/h (open / closed cycle)
  • Closed-circuit cooling 150 / 26 m³/h (cooling tower open / closed tube heat exchanger cycle)
  • Partial flow filtration
  • Sludge and waste water storage, sludge dewatering by chamber filter press
  • Cooling water blowdown
  • Pressure compensation, emergency water supply

Emirates Techno Casting
(PDF, German)
439 kB

Emirates Techno Casting
(PDF, English)
370 kB
Client
Emirates Techno Casting FZE
Start of construction
05/2007
Completion
08/2007
Commissioning
10/2007
Closed-circuit cooling capacity
2.3 / 0.4 MW
Flow-through
max. 150 m³/h