Selected Projects
- › WWTP Gaza
- › Waterworks Lingen
- › MBR Municipal Wastewater
- › MBR Brewery Wastewater Caribbean
- › Drinking Water Chabarovsk
- › WWTP Bettembourg
- › WWTP Immenstaad
- › Rothaus Brewery
- › Biogas Plant Lustadt
- › WWTP Eisenhüttenstadt
- › Anaerobic Treatment Plant Bitterfeld
You can find a detailed overview about our projects in the downloads section.
Water Treatment Dubai
Work Scope
- Basic and detail engineering
- Supply of complete Electro-Mechanical Equipment
- On-Site Work Supervision
- Commissioning / Training
- SCADA
- Supply of Spare Parts
Process Steps
- Process Water Treatment (10 m³/h)
- Cooling water circulation 100 m³/h (open / closed cycle)
- Closed-circuit cooling 150 / 26 m³/h (cooling tower open / closed tube heat exchanger cycle)
- Partial flow filtration
- Sludge and waste water storage, sludge dewatering by chamber filter press
- Cooling water blowdown
- Pressure compensation, emergency water supply
- Client
- Emirates Techno Casting FZE
- Start of construction
- 05/2007
- Completion
- 08/2007
- Commissioning
- 10/2007
- Closed-circuit cooling capacity
- 2.3 / 0.4 MW
- Flow-through
- max. 150 m³/h